Page 112 - Green Pin Product Catalog
P. 112

LIFTING SLING FITTINGS FOR WIRE ROPE
      FOR WIRE ROPE             SLEEVES







                                            Applications




                                            Sleeves are used to create loop ends on wire rope slings.
                                            They are available in two types and in various sizes.
      LIFTING SLING FITTINGS






                                Design


                                Aluminium wire rope sleeves are manufactured according to EN 13411-3. For safety during fabrication and
                                application they are of seamless construction. Prescon carbon steel sleeves are manufactured from carbon
                                steel. The sleeves are of seamless construction and fit industry standard dies.

                                Instructions for use

                                For Aluminium sleeves, please refer to EN 13411-3. Prescon sleeves are recommended for use with 6 x 19
                                or 6 x 37 IPS or XIP (EIP), RRL, FC, or IWRC wire rope. After creating a loop end multiple progressive
                                pressings are required to prevent flash, which will develop into a permanent mark or possibly a crack in
                                the sleeve. A light oil lubricant should be applied to each die before pressing. The sleeve must be cleaned
                                after the swaging operation to stimulate effective colour change. Colour change is not an indication for
   3 .1                         proper swaging, only an indication that the sleeve has been pressed. Proper swaging practices are the sling
                                manufacturer’s responsibility. Before using sleeves with other type lay, construction or grade of wire rope,
                                it is recommended that the termination be proof loaded to prove the adequacy of the assembly. Regular
                                inspection of the swaging machine, dies etc. must be conducted to ensure that the equipment continues
                                to meet required standards.












































          112
   107   108   109   110   111   112   113   114   115   116   117