Page 261 - Green Pin Product Catalog
P. 261

Instructions for use

                            For general (assembly) instructions about shackles we refer to chapter 1, and for master links to chapter 3.
                            For the mooring bolt, please find the specific instructions below.

                            Fishing and aquaculture products must be regularly inspected in accordance with the safety standards
                            and regulations given in the country of use. This is required because the products in use may be affected
                            by deteriorating conditions such as wear, misuse and overloading, which may lead to deformation and
                            alteration of the material structure. Inspection should take place at least every six months (follow the local
                            rules in the country of use), and more frequently when the links are used in severe operating conditions.  FISHING & AQUACULTURE

                                                   ®
                            Installation of the Green Pin  Mooring Bolt
                            Green Pin  Mooring Bolt NS9415 T must be installed by the use of two-component grouting. The advised
                                   ®
                                                 ®
                                                                                              ®
                            grouting to be used is Fosroc  Lokfix S25 or equivalent. Before installation of the Green Pin  Mooring Bolt
                            NS9415, always consult the installation manual of the used grouting and respect the instructions.
                            For instructions on how to machine the hole and the application and hardening time of the grouting,
                            please always consult the installation manual of the grouting supplier first. The mounting depth is indicated
                            by the green colour. Install the Mooring Bolt NS9415 T until the green-coloured part is reached.
                            The green-coloured part may not enter the hole.




















                                                                  ®
                                               ®
                            Assembly of Green Pin  Shackles to Green Pin  Mooring Bolts
                            Ensure that the inside length of the chosen shackle is minimized so that the shackle cannot be (dis)assembled
                            from/to the Mooring bolt without disassembling the shackle pin.















                            In any case; Shackles and mooring bolts that are connected to each other shall have dimensions that are
                            adapted to each other, in order to prevent any increase in the risk of damage and fish escape.  5
                                               ®
                            Assembly of Green Pin  Mooring Shackles
                            Green Pin  Mooring Shackle is equipped with a chamber in which the pinhead will fit. During assembling
                                   ®
                            the pinhead will block in the chamber which facilitates easier assembling. Please note that it is not allowed
                            to fit the nut into this chamber.

















                                                                                                            261
   256   257   258   259   260   261   262   263   264   265   266