Page 291 - Green Pin Product Catalog
P. 291

®
                            In case of contact between Green Pin Tycan  Lashing Chain and the load or operating material, protective
                            sleeves must be used when the surface edge is ‘less’ than 6 mm radius.



                                                     Edge radius more than 6 mm;
                                                     No protective sleeve
                                                     required but recommended.                                      LASHING CHAIN & FITTINGS







                                                     Edge radius less than 6 mm;
                                                     Protective sleeve required.








                                                     No obvious edge radius or in doubt;
                                                     Protective sleeve required.






                                                 ®
                            Connecting Green Pin Tycan  Lashing Chain directly into hooks (components) where the width/clevis is
                            more than required maximum clevis width is not acceptable. Doing so can cause the layers to spread apart,
                            which in the utmost consequence could have a negative effect on the strength of the chain. Also make sure
                            that the hook is not hooked in between the layers of the Green Pin Tycan  link.
                                                                                 ®


























                            Loadbinders and fittings must be regularly inspected in accordance with the safety standards and regulations
                            given in the country of use. This is required because the products in use may be affected by wear, misuse,
                            overloading etc. which may lead to deformation and alteration of the material structure. Inspection should
                            take place at least every six months and more frequently when the loadbinders, lashing chain and/or fittings   7
                            are used in severe operating conditions. Regularly lubricate all moving parts of a loadbinder to extend
                            product life and reduce wear.














                                                                                                            291
   286   287   288   289   290   291   292   293   294   295   296